Accomplished Projects
Two 25 t Tonne Overhead Cranes – Ryan Polymer Pouya Company – Spring 2021
A 32 Tonne Explosion Proof Overhead Crane – Arian Methanol Company – Winter 2021
A 20 Tonne Explosion Proof Overhead Crane – Pars Glycol Company – Winter 2021
An 8 Tonne Overhead Crane and a 3.2 tonne – Zagros Airlines – 2019
A 5 Tonne Explosion Proof Overhead Crane – Laleh Petrochemical Company, Intallation at Asaluyeh Site – 2013
Two 80 Tonne Explosion Proof Overhead Cranes – Kavian Petrochemical Company, Olefin Halls 1 and 2 – 2010
Construction of the Platform for Installation of Equipment and Production Line Machinery of Pak Plastic Company – 2010
Design, Construction and Installation of Cement Silos for the New Block Production Line – Lika Factory – 2009
Chitgar Qaem Tower, Installation in Tehran – 80,000 m2 – 2018
Chitgar Baharan Tower, Installation in Tehran – 20,000 m2 – 2017
Mehran Project, Multi-Storey Car Parking, Installation in Pasdaran – 68,000 m2 – 2016
Ceiling and Walls Coverings for the Product Warehouse with an Area of 40,000 m2 – Miandoab Petrochemical Company – 2017 and 2018
Roof Coverings with an Area of 50,000 m2 – Imam Khomeini Refinery of Arak (Shazand) – 2012
Roof Coverings with an Area of 75,000 m2 – Maroun Petrochemical Company, Mahshahr Special Economic Zone – 2003
Manufacturing and Painting of More Than 30,000 m of Flushing Types – Imam Khomeini Refinery of Arak (Shazand) – 2010 and 2011
Manufacturing and Painting of More Than 25,000 m of Flushing Types – Maroun Petrochemical Company – 2001 and 2002
500 Tonnes of Steel Structure, Amphitheatre and PET-Scan Building – Rajai Heart Hospital, Tehran – 2017
4,000 m2 of Metal Framework – Kermanshah Petrochemical Company, Box Opening Warehouse – 2017
2,200 Tonnes of Steel Structures – Housing Cooperative of Copper Industries, Installation in Punak – 2012
1,000 Tonnes of Metal Skeleton – Hasheminejad Project, Tehran – 2011